  • Delaware Net Energy Metering and Small Generator Interconnections

  • We support renewable energy and partner with our customers to ensure safe and reliable interconnection of renewable energy into the electric grid.

    The Delaware Code, Title 26 -- Public Utilities, Chapter 10 defines the small generator interconnections and net-energy metering application process Delmarva Power follows. Small generator technologies that qualify for interconnection with our system include solar (photovoltaic or “PV”), wind, hydro, a fuel cell, or gas from anaerobic digestion. The two-part interconnection application process  connects your renewable generator system to the electric grid. This complex process takes approximately 77 business days from when Delmarva Power receives your complete application to when Delmarva Power issues your Authorization to Operate, including the time during which your contractor installs your solar array or other renewable generating system.

    Here is information to guide you through the process.